Cutting machine
1 Machine purpose
The linear reciprocating multifunctional cutting machine is a widely used machine with simple operation, safety, and easy maintenance. Suitable for processing round, shredded, and long sections of root, stem, grass, branch, and vine plant medicines. For example: Paeonia lactiflora, Wuyao, Huangqi, Mutong, Fructus Aurantii, Lingzhi, and so on..
(Cut length,1mm--5CM)
Diagram Introduction
1Sliding rod sleeve 2Roll forward 3connection plate 4eccentric shaft 5geneva wheel 6adjusting block 7bearing housing 9motor 10ratchet 11filler hole 12Get lost 13Adjustment rod (brushed) 14slider 15screw 16Adjusting silk 17Pressure rod.
1, Before starting up, be at the refueling station1and11add30#Engine oil, daily8Hour by hour calculation,1Add daily4Next time.11place15Add once a day. If it cannot operate normally, it should be cleaned with diesel or gasoline10Ratchet wheelThen add engine oil.
2, When the conveyor belt cannot operate normally, first check whether the conveyor belt deviates. If it deviates, adjust the wire drawing13Rotate left and right to adjust. Rotate the wire drawing clockwise on which side of the conveyor belt deviates.
3, When adjusting the thickness of the decoction pieces6Adjust the position by first releasing the adjustment block15Screw, turn the adjusting screw again16Clockwise rotation is for thickening, while the opposite is for thinning. After adjustment, tighten the screws again15Just enough.
4, If replacing the conveyor belt, remove the protective cover and tray on the machine. Rotate the two wire drawing rods behind the conveyor belt counterclockwise, so that the conveyor belt will gradually loosen. Then remove all the accessories contained in the circular conveyor belt one by one, put on the conveyor belt, and firmly install the removed accessories in their original positions. Finally, roll the roller behind you Install the wire drawing rod and rotate it clockwise to tighten the conveyor belt. Complete the tape replacement.