User Manual for Reactor 5L Laboratory Vacuum Emulsifier
Precautions
-
After opening the box, please promptly inspect the specifications and quantity of the equipment according to the packing listIf there are any deviations, please fax them020-3999 3183Please inform my company.
- If any damage is caused to the equipment due to transportation reasonsPlease negotiate directly with the carrier and contact our company in a timely manner.
- Before installing the equipment, it is necessary to carefully read the installation instructionsAnd the installation of the equipment will be completed by professionals.
- Before using the equipment, a trial run must be conductedAnd it is the responsibility of the debugging engineer dispatched by the Equipment Food Business Unit.
- Equipment operators must carefully read the equipment user manualOnly after receiving operational training can one take up their post.
- Before the equipment is officially put into operationIt is necessary to establish relevant operating procedures and job systems.