Welcome Customer !

Membership

Help

Wenzhou Liaofei Explosion proof Electrical Co., Ltd
Custom manufacturer

Main Products:

pharmamach>Article

Wenzhou Liaofei Explosion proof Electrical Co., Ltd

  • E-mail

    1558021501@qq.com

  • Phone

    15658605551

  • Address

    Liuzhai Village, Liushi Town, Yueqing City

Contact Now
Installation precautions for explosion-proof axial flow fan
Date: 2023-05-25Read: 5
The BAF-300 explosion-proof axial flow fan is used to transport flammable and explosive gases. The impeller is made of aluminum alloy to prevent sparks during operation, and the motor adopts explosion-proof type.
The BT35-11 explosion-proof axial flow fan is suitable for transporting flammable, explosive, and non corrosive gases, with an ambient temperature not exceeding 60 ℃. BT35-11 explosion-proof axial flow fan is widely used for ventilation and heat dissipation in general factories, warehouses, offices, and residential areas. It can also be installed in series at intervals in longer exhaust pipes to increase the pressure in the pipes. After removing the motor, it can be used as a free fan.
Installation instructions for explosion-proof axial flow fan:
1. Before installation, the fan should be carefully inspected for any damage or deformation. If there is any damage or deformation, it should be repaired properly before installation can proceed.
2. During installation, pay attention to checking whether the connecting parts are loose, and the gap between the blades and the air duct should be even and not collide.
3. The weight of the connecting air duct should not be borne by the air duct of the fan, and additional support brackets should be added during installation.
4. A collector must be installed at the air outlet of the fan, and it is recommended to install a protective net.
5. The fan base must be naturally connected to the foundation plane, and it is not allowed to forcefully connect the base by knocking it to prevent deformation. During installation, the base should be calibrated, iron pads should be added, and the basic horizontal position should be maintained. Then, the anchor bolts should be tightened.
6. After installation, it is necessary to conduct experiments and wait for normal operation before allowing formal use.