Welcome Customer !

Membership

Help

Zhejiang Jiade Packaging Machinery Co., Ltd
Custom manufacturer

Main Products:

pharmamach>Article

Zhejiang Jiade Packaging Machinery Co., Ltd

  • E-mail

    jiadebj@jiademachine.com

  • Phone

    13967766826

  • Address

    No. 6 Wansheng Road, Wanquan Industrial Park, Pingyang County, Wenzhou

Contact Now
Maintenance methods for fully automatic vertical box packing machine
Date: 2025-09-01Read: 48
The maintenance and upkeep of the fully automatic vertical box packing machine should be combined with the structural characteristics of the equipment and production needs. The following are the key maintenance points and operating specifications:
1、 Daily cleaning and inspection
1. Power off cleaning: After daily shutdown, the power should be cut off to remove dust from the surface and interior of the equipment, with a focus on cleaning areas such as the feeding track and folding mechanism that are prone to residual paper scraps or glue stains.
2. Key component inspection:
Check whether the conveyor belt and pressure roller are worn or off center, and adjust or replace them in a timely manner.
Clean up the residual glue in the adhesive system to avoid drying up and blocking the glue head.
2、 Lubrication and fastening
1. Lubrication of transmission components:
Bearings, chains, and other parts need to be regularly lubricated with oil or butter, at least once a month.
It is recommended to apply butter to the paper feeding track gear every 30 days to ensure smooth operation.
2. Fastener inspection: Regularly inspect screws, nuts, and other fasteners to prevent loosening that may cause equipment vibration or displacement.
3、 Electrical system maintenance
1. Control box cleaning: Clean the dust in the electrical control box every month to avoid the risk of short circuit, and check whether the sensors and circuit connections are normal.
2. Parameter calibration: Check parameters such as air pressure and speed through the touch screen control system to ensure they match production requirements.
4、 Replacement of vulnerable parts
1. Nail head/glue head: Regularly check for wear and tear, and replace immediately if the quality of the nail joint decreases or the glue application is uneven.
2. Filter and seals: Clean or replace the air compressor filter to prevent impurities from entering the air system.
5、 Commissioning before startup
1. No load test run: Before starting, manually rotate the main motor for 1-3 cycles to confirm that there is no jamming.
2. Mold matching: Replace the paper box mold according to product specifications to ensure the accuracy of cutting and packaging.
Attention: Strictly follow safety regulations during maintenance and avoid live operation. Thoroughly clean and apply rust proof oil before long-term use, and thoroughly check the lubrication status when reusing.