-
E-mail
15921850385@163.com
-
Phone
15921850385
-
Address
No. 27 Xinxin East Road, Shuyuan Town, Pudong New Area, Shanghai
Shanghai Binrun Environmental Protection Technology Co., Ltd
15921850385@163.com
15921850385
No. 27 Xinxin East Road, Shuyuan Town, Pudong New Area, Shanghai
Hebei injection water equipmentHebei injection water equipment
Injection water equipment
Main component function introduction:
1.Raw water tank, function: It stores the raw water of the system, regulates the inflow, and also has a certain sedimentation effect on impurities in the inflow.
2.Sand filter, function: preliminary removal of sediment, impurities, suspended solids, and other particles in water to reduce water turbidity.
3.Carbon filter, function: using the adsorption principle of carbon to adsorb discoloration, odor, residual chlorine, etc. in water.
4.Softener, function: uses cation exchange resin to replace calcium and magnesium ions in water, reducing the hardness of water.
5.Security filter, function: prevent large particle impurities from entering the reverse osmosis membrane, causing damage to the membrane, and protect the reverse osmosis membrane.
6.Dual stage reverse osmosis host, function: mainly used for producing purified water through reverse osmosis filtration.
7.PHRegulating system, function: throughPHAdjust and remove waterCO2Ensure the quality of the produced water.
8.Purified water tank, function: to store secondary reverse osmosis produced water and provide a water source for terminal purified water usage points.
9.Multi effect distillation machine, function: to produce injection water through multi effect distillation.
10.UV sterilizer, function: to kill residual bacteria in water and ensure effluent quality.
11.Pasteurization system, function: used for cleaning purified water pipelines and purified water tanks.
12.Purified water booster pump,Function: To transport pure water to water points.
Shanghai Binrun Supply Ultra Pure Water Equipment After salesservice
1Warranty commitment: The product is guaranteed for one year from the date of successful debugging. If the product is not caused by human factors during the warranty period, it will be repaired free of charge.
2Debugging commitment: After the installation of the water production equipment provided and installed is completed and passes the on-site pressure test and debugging, it can only leave the site with the consent and signature of the representative of the demander.
3Training commitment: Technical personnel can be sent to assist in guiding installation and debugging according to the requirements of the demand side; During the trial operation, train the relevant operators of the demand side until the product operates normally.
4Maintenance commitment: In case of equipment malfunction, upon receiving notification12-24On site service within hours.
5Lifetime commitment: After the product warranty period ends, we will provide you with lifelong service and paid accessories.
6Accessory commitment: We can provide timely and complete accessory services both inside and outside the warranty period.