- Phone
-
Address
No. 100 Baisha Avenue, Jiangnan District, Nanning City
Guangxi Guangpu New Energy Equipment Co., Ltd
No. 100 Baisha Avenue, Jiangnan District, Nanning City
Special UV sterilizer for sewage treatmentIt is a series of products developed and produced for UV water treatment based on the mature application of UV technologySterilization and disinfection equipmentGuangpu's sewage ultraviolet sterilizer adopts an automatic cleaning form, which can automatically clean the attached substances of quartz sleeves, ensuring the penetration rate of ultraviolet rays.
The sewage specific ultraviolet disinfection device has a wide range of sterilization, rapid sterilization, and can effectively kill and remove microorganisms in sewage, including bacteria, viruses, fungi, and protozoa (such as Cryptosporidium and Giardia), and remove biological pollution in sewage.
Automatic cleaning of quartz sleeves, easy maintenance, large sewage treatment capacity, stable and reliable.
Widely applicable, it can sterilize and disinfect industrial sewage, municipal sewage, domestic sewage, hospital sewage and other sewage.
The sewage dedicated ultraviolet disinfection device is horizontally installed, with the bracket fixed on the designated foundation or workbench (connected to the inlet and outlet). The sterilization device is located indoors, and in addition to considering the convenience of water supply and drainage and meeting the requirements of the process flow, attention should be paid to leaving an installation position where the ultraviolet lamp tube and space can be extracted. The electrical control box is installed near the device, with a relative humidity of no more than 80 ℃, no corrosive gases, no conductive dust, and no strong vibration and impact.
Special UV disinfection device for sewage, with two water outlets that can be selected as the inlet and outlet according to the pipeline direction. It can be placed horizontally or vertically according to user needs. To facilitate the replacement of light and quartz tubes, there should be space of the same length on one side of the equipment.
After product installation, conduct a water test to ensure no water leakage, and then connect the power supply.
After connecting the power supply, the indicator light will turn on to ensure that the lamp head and lamp tube are connected properly. Then, press the "power switch" button on the dust cover and the lamp tube indicator light will turn on. The timer will rotate and wait for 3-5 seconds for the lamp tube to light up. At this time, the equipment will operate normally. After confirming that the lamp tube is on for 3-5 minutes, first open the water valve, and then open the water inlet valve. At this point, the machine will start running.