Welcome Customer !

Membership

Help

Beijing Zhongtian Huitong Technology Co., Ltd
Custom manufacturer

Main Products:

pharmamach>News

Beijing Zhongtian Huitong Technology Co., Ltd

  • E-mail

    bjztht@163.com

  • Phone

    13121779988

  • Address

    No. 88 Xingye Road, Jingzhou Industrial Park, Tongzhou District, Beijing

Contact Now
The main structure and maintenance of the fully automatic bead blasting production line
Date: 2024-08-21Read: 7
  Fully automatic bead blasting production lineSuitable for exploring processes, developing new drugs, and mass production, with accurate loading, low energy consumption, low noise, easy operation, cleaning, and maintenance. Suitable for the production of health products and tobacco industry pellets.
  Fully automatic bead blasting production lineThe main structure
1. The host consists of the main body, nozzle body, glue tank, contents tank, electrical control, paraffin oil circulation, refrigeration system and other main parts. The main body of the host includes the frame, transmission system, feed oil pump, etc.
2. The nozzle body consists of a valve body, a heating rod, a nozzle, and a cutting ring, forming pellets here.
3. The glue tank and content tank can provide material supply for glue liquid and content.
4. The electrical control cabinet is equipped with electrical systems and instruments that control and display the working status of the drip pill machine. Paraffin oil circulation and refrigeration system.
  Fully automatic bead blasting production lineMaintenance and upkeep
1. Regularly check the insulation resistance and grounding reliability of each component and control circuit in the electrical system to ensure electrical safety.
2. Check whether the eccentric wheel on the spindle is loose in each shift, and tighten it promptly if any looseness is found.
3. Check the storage capacity of paraffin oil and oil tank in each shift, and promptly replenish if insufficient. Regularly clean the paraffin oil circulation pipeline.
4. The glue pot, material box, and pill box must be cleaned thoroughly when stopped from use.
5. Check the tension level of the high-speed main engine transmission belt during each shift, regularly check whether the transmission system is running normally, and repair any problems in a timely manner.
6. Generally, all pipelines are cleaned every three months, and all mechanical equipment is disassembled, inspected, and cleaned annually.