Welcome Customer !

Membership

Help

Dongguan Jike Automation Technology Co., Ltd
Custom manufacturer

Main Products:

pharmamach>Article

Dongguan Jike Automation Technology Co., Ltd

  • E-mail

    15013620917@163.com

  • Phone

    15013620917

  • Address

    No. 9 Minfu Road, Liaobu Town, Dongguan City, Guangdong Province

Contact Now
Precautions for using C-type dual head micro pump
Date: 2025-08-22Read: 5
  The C-type dual head micro pump is widely used inBiological agents, pharmaceuticals, power outages CV、 Precision quantitative filling of liquids such as heat pipes and water agents.
The precautions for using the C-type dual head micro pump are as follows:
1、 Equipment preparation and inspection
‌•Power and pipeline inspection: Before use, ensure that the battery is fully charged, check that the dual pump pipelines are not twisted or leaking, and that the syringe specifications (such as 20ml/50ml) match the pump head.
‌•Calibration and self inspection: After using or replacing consumables, it is necessary to calibrate the flow accuracy and regularly test the sensitivity of the pressure sensor.
2、 Drug configuration and infusion standards
‌•Accurate calculation: During dual channel infusion, the dosage unit (such as mL/h or μ g/kg/min) needs to be independently checked, and the error of vasoactive drugs should not exceed 10% of the set value.
‌•Compatibility management: Avoid contraindications for dual channel drug compatibility, use light avoiding extension tubes for light avoiding drugs, and check for precipitation of easily crystallized drugs every 2 hours.
3、 Key points of operation and monitoring
‌•Fixation and protection: Three point fixation method (pump body+dual catheter interface+puncture point) is used to prevent displacement, and priority is given to protecting the pipeline when turning over or moving the patient.
‌•Real time monitoring: Record the actual infusion volume difference between the two pumps every 30 minutes, and be alert to unilateral blockage or leakage.
4、 Emergency and Maintenance
‌•Alarm handling: Prioritize troubleshooting blockages (gently rubbing the pipeline), low pressure (re fixing), or power issues, and prohibit forcibly closing alarms.
‌•Maintenance requirements: The dual pump channels should be cleaned alternately daily (wiping the guide rails with 75% alcohol), and long-term disuse should be charged and discharged monthly.