-
E-mail
2109676989@qq.com
-
Phone
15961853932
-
Address
No.1 Zhangjingjingshi Road, Xibei Town, Xishan District, Wuxi City
Wuxi Shenyu Environmental Protection Equipment Co., Ltd
2109676989@qq.com
15961853932
No.1 Zhangjingjingshi Road, Xibei Town, Xishan District, Wuxi City
03.19,20253
Product Overview: Stainless steel integrated interception and lifting equipment is an integrated and intelligent rainwater and sewage diversion and interception treatment device, mainly used in urban drainage systems, rainwater and sewage merging transformation, black and odorous water treatment and other fields. Its core functions include dry season sewage interception, rainy season rainwater and sewage diversion control, automated flow regulation, etc. It achieves efficient and durable operation through stainless steel material and intelligent control system. 2、 Technical feature 1 Material advantages: Made of 304 stainless steel or fiberglass cylinder, with strong corrosion resistance and long service life, suitable for humid and highly polluted environments. Compared to fiberglass material, stainless steel cylinder has more advantages in impact resistance and maintenance convenience [3]. two Intelligent control • Equipped with liquid level sensors, rain gauges, and remote monitoring systems, it automatically adjusts the opening and closing of gates and the start and stop of water pumps, accurately controlling the flow rate. Support remote management on DCS or IoT platforms to reduce manual intervention Modular design • Factory prefabrication, short on-site installation cycle (about 3-7 days), occupying only one-third of the area of traditional concrete interception wells. Integrate anti siltation base, interception device, safety grille and other components to reduce the frequency of manual dredging. four Performance parameters • Processing capacity range: 10-300m ³/h (customizable) Power: 22-28kW (adjusted according to model) • Noise: ≤ 18dB, Suitable for residential areas 3. Application scenarios • Rainwater and sewage diversion renovation: suitable for old urban areas, urban villages and other areas that cannot be diverted, reducing sewage entering the river. • Sponge city construction: combined with underground design, optimizing rainwater collection and discharge. • Black and odorous water treatment: reducing pollutant emissions through precise interception control. • Municipal pipeline engineering: as an alternative to pump station upgrading, improving drainage system efficiency. 4. Compared with traditional interception wells, the construction period of integrated intelligent interception equipment for traditional interception wells is 1-2 months (requires on-site pouring) 3-7 days (prefabricated installation), low interception efficiency (relies on manual adjustment), high (automation control) maintenance cost (requires manual dredging and maintenance), low (anti siltation design+remote monitoring) cost. High (with a large proportion of civil engineering costs) Low (modular production)