Welcome Customer !

Membership

Help

Nanjing Kangshan Pharmaceutical Equipment Co., Ltd
Custom manufacturer

Main Products:

pharmamach>Products

Nanjing Kangshan Pharmaceutical Equipment Co., Ltd

  • E-mail

    114067542@qq.com

  • Phone

    15051802578

  • Address

    Nanjing Kangshan Pharmaceutical Equipment Co., Ltd., Pukou District, Nanjing City, Jiangsu Province

Contact Now

2D motion mixer

NegotiableUpdate on 01/07
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
This machine is used for high uniformity mixing of powdered and granular materials in pharmaceutical, chemical, food, light industry, electronics, machinery, mining and metallurgy, national defense industries, and various scientific research units.
Product Details

This machine is used for high uniformity mixing of powdered and granular materials in pharmaceutical, chemical, food, light industry, electronics, machinery, mining and metallurgy, national defense industries, and various scientific research units.

2、 Main technical parameters

1Capacity of the material cylinder 50rise

2Loading capacity 30rise

3Loading weight 80kilogram

4Spindle speed 0-13turn/divide

5Motor power 1.1kilowatt

3、 Equipment installation

1This machine adopts the whole machine in place and does not require the installation of feet or bolts, but the installation ground needs to be flat (unevenness ≤3/1000). After the equipment is in place, the gap between the bottom perimeter and the ground should be eliminated.

2Refer to the electrical schematic diagram for the wiring of the power supply

3When the power is turned on for no-load testing, pay attention to whether the rotation of the main shaft matches the direction of the arrow. If it does not match, it can be adjusted by changing the phase of the power supply.

4During the no-load test, if there is any shaking of the rack, it can be added at the bottom10-16mmRubber shock pads are used to solve this problem.

5If the discharge height does not meet the user's process requirements, the user can make a raised foundation at the bottom as needed, but the frame needs to be fixed with bolts.

6After installation, a no-load test run should be conducted before operation10Minutes, can be officially operated.