-
Phone
1895372451118605374511
-
Address
Jining National High tech Industrial Park, Shandong Province
Jining Zhuoli Industrial and Mining Equipment Co., Ltd
1895372451118605374511
Jining National High tech Industrial Park, Shandong Province
List of Common Accessories for YT29A Air Leg Rock Drill:
ratchet
Valve cabinet
valve cover
Spiral Mother
piston
Cylinder body
Guide Sleeve
sound proof housing
bush
aircraft nose
rotating sleeve
Spline nut
Long screw
operating valve
hydro-acupuncture
gas needle
Large sealing sleeve
handlebody
Pressure regulating valve
Control handle
【 Instructions for using rock drills (air drills) 】:
Proper use of rock drills is a beneficial guarantee for achieving efficient rock drilling. The specific operation is as follows:
(1) Wind pressure requirement: The wind pressure should be between 0.45-0.55MPA. Machine efficiency will significantly decrease below 0.4MPA, and machine parts will wear faster above 0.55MPA.
(2) Water pressure requirement: It is not allowed to be equal to or higher than the wind pressure. Water pressure higher than the wind pressure will cause water to flow back into the body, damage the lubrication system, accelerate wear, reduce the life of parts, and also reduce the torque force of the machine and the rock drilling speed.
(3) Conduct a thorough inspection: The lubricating oil is mixed with compressed air and discharged from the exhaust hole, with an oil film covering the tail of the drill.
(4) Remove impurities: Before connecting the rock drill, blow out the water vapor and impurities in the pipeline, otherwise the impurities will damage the rock drill.
(5) Proper oiling: Do not use inferior engine oil or waste oil. The fuel consumption of rock drills and gas legs should be 3-4 milliliters per minute.
| Jining Zhuoli Rock Drilling Equipment Co., Ltd. has always won customers' favor with its four point after-sales commitment. 1、 Product Quality Commitment: 1. The manufacturing and testing of the product have quality records and testing data. 2. For the testing of product performance, we sincerely invite users to personally inspect the entire process and performance of the product. After the product is confirmed to be qualified, it will be packed and shipped. 2、 Product price commitment: 1. In order to ensure the high reliability and progressiveness of the products, the materials of the system are selected from domestic or international high-quality brand-name products. 2. Under equal competitive conditions, our company sincerely offers you the most favorable price without sacrificing product technical performance or changing product components. 3、 Delivery time commitment: 1. Product delivery time: Try to meet user requirements as much as possible. If there are special requirements that need to be completed in advance, our company can organize special production and installation to strive to meet user needs. ① Technical Maintenance and Repair Manual ② Installation diagram ③ Outsourced parts manual and manufacturer ④ Provide a list of vulnerable parts and spare parts, and attach a certain amount of spare parts 4、 After sales service commitment: 1. Service tenet: fast, decisive, accurate, thoughtful 2. When delivering the product, our company provides the following documents to the user:; 3. Service objective: To achieve customer satisfaction through high-quality service 4. Service efficiency: If the equipment malfunctions during or outside the warranty period, the supplier will notify the maintenance personnel to arrive at the site within 24 hours and start the repair. 5. Service principle: The product warranty period is 12 months. During the warranty period, the supplier will provide free repair and replacement of parts damaged due to quality reasons. For parts damaged outside the warranty period, only the cost fee will be charged for the provided parts. For equipment damage caused by human factors of the purchaser, the supplier's repair or provided parts will be calculated at cost price. |