Overview

EPC engineering general contracting: conceptual design, construction drawing design, process equipment supply, procurement of supporting facilities, purification engineering, pipeline engineering, mechanical and electrical installation, equipment engineering confirmation and verification, data management, project delivery and other services.

Product Details

EPC engineering general contractingService:

Conceptual design, construction drawing design, process equipment supply, procurement of supporting facilities, purification engineering, pipeline engineering, mechanical and electrical installation, equipment engineering confirmation and verification, data management, project delivery and other services.


EPC engineering general contractingService Advantages:

Systematic and standardized project management

● Better meet regulatory requirements

● Better meet the needs of pharmaceutical processes

● Can improve equipment automation, informatization, and intelligence

● Improve efficiency and reduce costs

● Shorten project cycle

● Good validation and confirmation


Service process:

1、 Conceptual Design

Conceptual Design Report

● User requirements

● Provide preliminary prescription process

● Preliminary process flow chart

● Preliminary main equipment

● Preliminary estimation

● Verify strategy


2、 Basic Design

● Project Implementation Plan

Equipment layout diagram

● Construction of control system

● HVAC Roadmap

● Automation strategy

● Distribution map of public facilities


3、 Detailed Design and Procurement

Detailed design drawings

● Technical preparation

● Piping and Instrumentation Diagram

● Energy load arrangement

● Construction and installation instructions

● Procurement Instructions

● Procurement Quality Plan


4、 Construction and Installation

● Construction organization plan

● Labor resource allocation

● Guarantee measures for important construction nodes

● Quality and progress assurance measures

● Safe and civilized construction

On site construction management

● Construction handover document package


5、 Debugging and Confirmation

● System debugging report

System validation implementation

● Equipment verification

● Summary report

GMP architectural drawings