-
E-mail
413655868@qq.com
-
Phone
13501767698,18017683200
-
Address
No. 290 Chenjian Road, Chenjia Town, Chongming District, Shanghai
Shanghai Qiangshun Machinery Manufacturing Co., Ltd
413655868@qq.com
13501767698,18017683200
No. 290 Chenjian Road, Chenjia Town, Chongming District, Shanghai
Shanghai flower basket tablet press moldThe maintenance
The main content includes cleaning, lubrication, and inspection.
A、 Maintenance during mold installation:
1. Before installing the mold, the upper and lower surfaces of the mold should be cleaned to ensure that the installation surface of the mold and the worktable of the press are not damaged by pressure and the parallelism of the upper and lower installation surfaces of the mold during production;
2. After the mold is installed, open the mold and clean all parts of the mold, especially the guiding mechanism. For surface part molds, the surface should be cleaned to ensure the quality of the parts;
B、 Maintenance during production:
1. Regularly apply oil to the corresponding parts of the mold during production. For example, the pressing ring and rounded corner of the drawing die; The cutting edge of the trimming mold; Flanging blade section, etc;
2. Regularly clean the small hole waste channel of the trimming punching die.
C、Flower basket tablet press moldPost production maintenance:
1. After production is completed, a comprehensive inspection of the mold should be conducted;
2. Thoroughly clean the mold to ensure its cleanliness;
3. Clean up the waste inside the mold and ensure that there is no waste in the waste box;
If used for a long time, clean it up and spray it with rust proof oil. If not used for a long time, clean it up and put it in diesel.
