- Phone
-
Address
B3 Floor, Wuhan University Science and Technology Park, Daxueyuan Road, Donghu New Technology Development Zone, Wuhan City
Wuhan Zhongyi Baikong Instrument Co., Ltd
B3 Floor, Wuhan University Science and Technology Park, Daxueyuan Road, Donghu New Technology Development Zone, Wuhan City





When installing the sensor, insert it into the tank and use a wrench to tighten the hexagonal thread on the upper part of the sensor. Be careful not to twist the blue housing, as it may cause rotation between the blue housing and the probe rod during the tightening process. At the time of leaving the factory, the connecting cables between the electronic unit and the sensor inside the shell have been connected. Forcefully twisting the shell will cause the internal connecting cables to break;
2. During installation and construction, be careful not to subject the fork to strong impact to avoid damaging the piezoelectric crystal;
3. Instrument sensors should avoid the impact of materials as much as possible. When installed horizontally, the two parallel fork plates of the fork body should be perpendicular to the ground (at this time, the direction mark of the fork body should be raised or lowered) to ensure that materials can easily flow out between the fork plates.