2. After the equipment installation is completed, it must be truly grounded separately and not grounded with the common ground of the electrical box or instrument box.
3. Suggestion: When connecting ultrasonic level gauges to equipment that interferes with frequency converters, PLCs, etc., isolation transformers should be added to the power supply, signal isolators should be added to the signal section, and reliable grounding treatment should be carried out.
4. The signal line cannot be installed in the same cable tray as the power line or power line. It should be installed separately in a metal tube, or installed away from the power line or power line. Without installation in a tube, the distance from the power line or power line should be at least 1 meter.