-
E-mail
sales @ humgine.com.cn
- Phone
-
Address
China. No. 3213, Shanghai Hangzhou Highway, Fengxian District, Shanghai
Shanghai Huanjing Test Equipment Factory
sales @ humgine.com.cn
China. No. 3213, Shanghai Hangzhou Highway, Fengxian District, Shanghai
Usage of cold and hot shock box:
Mainly used to test the performance of products during storage, transportation, and use in climate environments with sudden changes in high and low temperatures. Widely used in electrical and electronic products, components, parts, aerospace, metal and other materials, conducting repeated instantaneous change tests from high temperature to low temperature and then to high temperature. Through the test, the physical, mechanical and other performance changes of the tested object in the environment can be understood, which can be used to determine whether the product's performance can meet the design requirements, and provide useful data for product quality control, product improvement, etc.
Characteristics of cold and hot shock box:
The high and low temperature cold and hot shock test chamber adopts a vertical box body and a cold and hot two box structure, and uses a basket to transfer the test area of the test sample to achieve the purpose of cold and hot shock testing. This structure reduces the heat load during thermal shock to the MAX limit, shortens the temperature recovery time, and is also a reliable and energy-saving way of thermal shock.
Requirements for the use of cold and hot shock boxes:
1. Equipment placement space requirements:
Environmental temperature: The placement site should have good ventilation or be equipped with air conditioning equipment to ensure that the surrounding temperature is within 0-30 ℃ after the equipment is started.
Venue requirements: flat and well ventilated (temperature accumulation cannot be formed at the equipment exhaust outlet), with the equipment exhaust side at least 1.5 meters away from the wall. There is no vibration, direct sunlight, or direct radiation from other heat sources around the equipment placement.
Air quality: No high concentration dust or corrosive gases, and cannot be tested or stored in flammable and explosive gases.
Relative humidity: less than 85% R.H
2. Space location: For the convenience of ventilation, operation, and maintenance, there should be a space at the equipment opening door where the door can be opened and closed normally.
3. Equipment power supply: meets the power requirements of the corresponding model.
Technical characteristics of cold and hot shock box:
1. Use economical refrigerants such as R404a and R23.
2. The basket can be moved from one box to another within 10 seconds.
3. During the cold to hot conversion process of the impact test, it can quickly recover to room temperature and maintain stability, avoiding the influence of air convection and thermal radiation inside the box through technical treatment.
4. A scientific air convection system can ensure uniform distribution of air inside the box.
5. Equipped with an imported all Chinese touch screen controller, various parameters of the cyclic test can be pre-set to automatically complete the entire test process, making it easy to use.
6. The control of dwell and transition time is adjustable.
7. When not conducting impact testing, a single box can be used for temperature change testing, with one box used for three purposes.
Technical parameter table:
|
model |
HSTCE-60 |
HSTCE-180 |
HSTCE-300 |
HSTCE-500 |
||
|
Dimensions of high and low temperature zones (depth, width, height) cm |
40×40×45 |
55×55×60 |
65×65×70 |
80×80×80 |
||
|
Basket size (depth, width, height) cm |
20×20×20 |
28×28×28 |
35×35×35 |
45×45×45 |
||
|
Dimensions (Depth, Width, Height) cm |
172×105×152 |
186×120×179 |
198×130×199 |
206×145×220 |
||
|
Ambient temperature requirements |
Vertical hatchback |
|||||
|
sexually |
Sample area |
Exposure temperature range |
A:-20℃~180℃; B:-40℃~180℃ ; C:-60℃~180℃ |
|||
|
Temperature deviation |
±3.0℃ |
|||||
|
Temperature uniformity/fluctuation |
± 2 ℃/± 0.5 ℃ (at constant temperature) |
|||||
|
recovery time |
5 minutes (the temperature reaches its original value for the first time) |
|||||
|
Recovery conditions |
Under no-load conditions, the MAX and MIN exposure temperatures are exposed for 30 minutes each; Location of temperature detector: air outlet. |
|||||
|
sample quality |
10kg |
15kg |
25kg |
35kg |
||
|
High temperature zone |
MAX temperature |
230℃ |
||||
|
heating up time |
Within 35 minutes at room temperature to 230 ℃ |
|||||
|
Low temperature zone |
MIN temperature |
A:-40℃; B:-60℃; C:-70℃; |
||||
|
Cooling time |
A: 50 minutes; B: 80 minutes; C: 100 minutes; |
|||||
|
control |
controller |
Programmable temperature controller, 7-inch true color LCD touch screen input, Chinese menu, PID self-tuning, data recording function, supports USB computer connection function, curve display function, etc., easy to operate. |
||||
|
Control accuracy |
Setting accuracy: temperature 0.1 ℃, indication accuracy: temperature 0.1 ℃ |
|||||
|
temperature sensor |
K-type temperature sensor |
|||||
|
Timing |
Any setting |
|||||
|
material |
casing |
Cold rolled steel plate production, corner arc and integrated flat design, with a beautiful and atmospheric appearance. |
||||
|
Box rust prevention |
Pre treatment with rust prevention before spraying, followed by electrostatic spraying, has excellent rust prevention function. |
|||||
|
Liner |
SUS304/2B stainless steel plate, with a curved inner liner design for easy maintenance. |
|||||
|
Thermal insulation material |
Ultra fine glass wool or polyurethane foam. |
|||||
|
Motor heat dissipation |
The box is specially deepened, coupled with axial fan ventilation, greatly improving motor heat dissipation, |
|||||
|
heater |
Customized stainless steel finned electric heating tube with uniform heat dissipation and long service life. |
|||||
|
Observation window |
Hollow conductive membrane electric defrosting observation window. |
|||||
|
seal |
High quality silicone sealing strip customized from molds, with a dedicated defrosting device installed at the door frame. |
|||||
|
air blower |
Centrifugal impeller and asynchronous motor |
|||||
|
Test frame |
Made of finely welded 304 stainless steel element steel |
|||||
|
Lift transmission |
Specialized lead cylinder, combined with solenoid valve, achieves precise displacement of the suspended basket. |
|||||
|
make |
compressor |
The original imported French "Taikang" fully enclosed refrigeration compressor is equipped with a compressor condensate connection plate. |
||||
|
Cooling method |
Mechanical compression cascade refrigeration, air-cooled or water-cooled. |
|||||
|
condenser |
Fin type radiator, high-quality external rotor motor; |
|||||
|
refrigerant |
R23 \ \ R404A refrigerant; |
|||||
|
Other accessories |
Filters, expansion valves, main solenoid valves, and other high-quality imported accessories. |
|||||
|
Safety device |
Power leakage protection, motor overload protection, compressor overpressure, overheating, overcurrent protection, under phase and phase loss protection, equipment safety grounding protection terminal, over temperature protection. |
|||||
|
Standard |
Two ф 50mm cable holes, universal pulleys and fixed support structures, two observation windows, and two window lighting fixtures. |
|||||
|
Options |
Special sample rack; Temperature recorder; Oil film drawing special treatment all stainless steel shell. |
|||||
|
remarks |
1. Model Description: "HSTCE" represents the "Hot and Cold Shock Test Chamber (Two box Type)" of Huanjing; 60 "indicates the approximate volume inside the box; A \ \ B \ \ C "indicates that the MIN temperature for low-temperature exposure is -20 ℃, -40 ℃, and -60 ℃, respectively. |
|||||
| Cold and hot shock box reference standards: | GB/T 2423.1-2001 Environmental Testing for Electrical and Electronic Products - Test A: Low Temperature GB/T 2423.2-2001 Environmental Testing for Electrical and Electronic Products - Test B: High Temperature GB10592-2008、GJB150.3 |
|||||